Malaysia

News
July 14, 2024
On Shell’s Capital Market Day in 2023, Shell committed to deliver upstream and integrated gas projects coming on stream between 2023 to 2025, with a total peak production of greater than 500,000 boed. Jerun is expected to contribute to this commitment.
News
July 10, 2024
Capable of producing up to 550 MMcfgd, this project is poised to address the increasing global energy demand at a time when executives are betting on natural gas.
News
May 29, 2024
MODEC, Inc. plans to open a new office in Kuala Lumpur, Malaysia, with more than 200 new positions in engineering and other corporate support functions to fill by early 2025.
News
May 08, 2024
Odfjell Technology will provide its innovative DrillRdillo tool, which increases well productivity, improves integrity and reduces operational costs. The company will also provide its Advanced Jetting Tool and Riser Combi Tool, as well as scrapers, brushes, magnets, filter equipment, weight set circulating tools, weight set swivels and circulating tools as part of both wellbore clean up contracts.
News
April 29, 2024
The Bunga Aster-1 well encountered approximately 17.5 m of oil-bearing sandstone with up to 46 m of potential oil column. Initial assessments indicate good reservoir characteristics.
News
April 22, 2024
SapuraOMV’s operated production in 2023 was about 500 MMcfd of natural gas, feeding the Bintulu liquefaction plant operated by Petronas Nasional Bhd., as well as 7,000 bpd of condensates, TotalEnergies said in the statement. It also holds interests in exploration licenses in Malaysia, Australia, New Zealand and Mexico.
News
April 03, 2024
In partnership with Malaysia Petroleum Management (MPM), PETRONAS, the custodian of oil and gas resources in Malaysia, this project aims to provide insights on the exploration opportunities in a broader play fairway and to assess the carbon storage potential across Penyu basin area.
News
March 27, 2024
McDermott will remove the existing flexible gas lift riser and perform the installation and commissioning of a new dynamic riser section and flowline comprised of two thermoplastic composite pipe jumpers. This will enable gas delivery to a subsea production system tied back to the Kikeh FPSO vessel.
News
March 01, 2024
The monetization of these clusters with an estimated recovery of approximately 4 Tcf from BIGST and 260 Bcf from Tembakau Cluster will significantly boost gas supply to the Peninsular Malaysia hub.  
News
January 31, 2024
In 2023, SapuraOMV’s operated production (100%) was about 500 Mcfd of natural gas, feeding the Bintulu LNG plant operated by Petronas, as well as 7,000 bpd of condensates.
News
January 25, 2024
The blocks under the PSCs span across three regions offshore Malaysia comprising two blocks in offshore Peninsular Malaysia, three blocks off the coast of Sarawak and one exploration block and one DRO cluster situated off the coast of Sabah.
News
January 08, 2024
The seventh phase of this multi-year project off the coast of Sabah encompasses over 5,000 km of new 2D seismic data acquisition, over 2,600 km of legacy seismic data processing, and 2,800 km2 of 2D-cubed processing as part of a multi-year contract originally awarded by PETRONAS in 2016.
News
December 26, 2023
PETRONAS Carigali Sdn Bhd has signed an MoU and two Technical Assistance Agreements with PTT Exploration and Production in relation to the development of the PTTEP-operated Blocks SK405B and SK410B, located off the coast of Sarawak, offshore Malaysia.
News
December 10, 2023
(WO) — PTTEP has made significant back-to-back discoveries offshore Malaysia, the company announced on Dec. 7. These include new findings in three fields off Sarawak, Malaysia—Chenda-1 in block SK405B, and Bangsawan-1 and Babadon-1 in block SK438.
News
December 06, 2023
The fourth and final well in the East Belumut infill drilling campaign is currently being tested after reaching 4,600 m measured depth in the southwest region of the field.
News
December 01, 2023
This achievement was the result of an intensified exploration program pursued in the last few years, which saw the drilling of 25 wells, the highest number of exploration wells drilled in a single year since 2015.
News
November 16, 2023
(WO) — CGG, in association with PETRONAS, has announced the start of the Selat Melaka 2D multi-client seismic program over the Langkasuka Basin offshore Malaysia. Located in the Malacca Strait, the project has received industry funding and will deliver early products in December 2023 and final results in August 2024.
News
November 07, 2023
Under the new contract, ABL’s rig-moving surveyors in Malaysia are expected to survey and approve approximately 14-16 rig moves offshore Malaysia for Velesto Drilling’s six-rig fleet during the period.
News
October 30, 2023
The Abu Cluster is made up of three developed fields, namely Abu, Abu Kecil and Abu SW Upthrown, with the remaining reserves of five million stock-tank bbl.
News
August 30, 2023
The survey is the third phase of a multi-year contract awarded initially by PETRONAS in August 2020 to acquire and process up to 105,000 km2 of multiclient 3D seismic data over a 5-year period in the Sarawak basin.
News
August 28, 2023
Timi is designed to produce up to 50,000 boed of gas at peak production and will evacuate its gas through a new 80 km pipeline to the F23 production hub.
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.