Onshore
News
June 26, 2024
Caerus aims to be “the Rocky Mountain region’s most efficient producer,” according to its website. The company operates more than 7,400 wells in the Piceance Basin in Colorado and Uinta Basin in Utah. It also has infrastructure assets including 2,400 miles of gas and water pipelines and a number of water treatment and storage facilities.
News
June 25, 2024
Pytheas Energy, Inc announced the addition of three producing oil and gas properties to its growing portfolio: the Andrews Crane asset, the Bakken asset, and the Minerva-Rockdale asset. These represent both working and non-working interests in 620 oil and gas wells, with a combined gross current production of approximately 357 bpd.
News
June 25, 2024
The agreement’s scope is to deliver human resources solutions for Repsol’s multi-disciplinary resourcing needs in areas such as drilling and wells, geology and subsurface, HSE, logistics, operations, maintenance, decommissioning, administrative support and cost control.
News
June 25, 2024
The shale asset (named Tatonka, approx. 46,500 acre) is in Texas with access to the Gulf Coast industrial area, which includes LNG export terminals and ammonia plants. MEPUSA will begin a drilling campaign to evaluate the well performance and develop and operate the asset for full-scale development after 2026.
News
June 25, 2024
Enverus has released its annual list of the 100 most prolific private oil and gas producers in the U.S. based on gross operated production, well count and rig movements across last year. Continental Resources and Ascent Resources remain in the top two positions on the list, with Aethon Energy moving up to the third position, according to Enverus.
News
June 24, 2024
ATP will pay 100% of the work program, which initially consists of drilling and completing the AND-4 and AND-5 wells in the Andorinha field and a workover in the CR-2 well located in the POT-T-281 block.
News
June 24, 2024
The aim of the agreement is to set out the next steps for implementing a gas to industry business through, on one side, commercialization of domestic gas and, on the other, the creation of a midstream compressed natural gas (“CNG”) partnership to supply Morocco’s growing industrial energy needs.
News
June 21, 2024
In a Tuesday panel at URTeC 2024, a key industry concern was to “make sure the talent is always flowing.” That was the sentiment expressed by Gretchen Gillis, Senior Geological Consultant, Saudi Aramco, Americas, drawing on a combination of experience with academia and the oil and gas industry. Other panelists included Dr. Zoya Heidari, Associate Professor, The University of Texas, Austin; Dr. Shaina Kelly, Assistant Professor, Columbia University; and Katerina Yared, Project Manager, Projeo Corporation.
News
June 20, 2024
Production start-up is expected in 2027, with a plateau of 300 MMcfgd (about 70,000 boed, including condensates). Gas from Ubeta will be supplied to NLNG, a liquefaction plant located in Bonny Island, in which TotalEnergies holds a 15% interest.
News
June 18, 2024
The Helmerich & Payne drilling rig is being rigged down and transported off location. Production testing equipment will then be mobilized to site. Testing is expected to commence within two weeks and is expected to take less than ten days to complete.
News
June 18, 2024
This five-year agreement covers a comprehensive range of services, from consulting and concept to detailed engineering, aimed at optimizing and expanding the existing facilities and infrastructure of one of the largest oil and gas condensate fields in the world.
News
June 18, 2024
Supported by TGS' extensive geological database, which includes data from over 425,000 wells and various interpretive products in the Permian basin, this survey offers a comprehensive resource for exploration and development.
News
June 18, 2024
Improvements in drilling and fracking techniques amid a wave of corporate takeovers will drive the expansion and more than offset recent reductions in rig deployments, analysts at the the London-based bank wrote in a note titled ‘Underestimate U.S. shale at your peril.’
News
June 14, 2024
The Vaca Muerta, Spanish for dead cow, is an oil and gas field in western Argentina, which is said to have natural gas reserves that rival the Permian basin. Its shale oil production, currently at about 300,000 bpd, is expected to grow to more than 1 MMbpd by 2030.
News
June 14, 2024
Donald Trump told Senate Republicans Thursday he would restart oil drilling in Alaska’s Arctic National Wildlife Refuge, reversing a move by the Biden administration to cancel leases in the frozen wilderness.
News
June 13, 2024
The well remains on schedule to begin drilling this month and is targeting 163 MMbbl of unrisked prospective oil resources or 843 Bcf of unrisked prospective natural gas resources, net to ReconAfrica.
News
June 12, 2024
Matador expects to have over 190,000 net acres in the Delaware basin, part of the greater Permian basin, producing over 180,000 boed, with proved reserves exceeding 580 MMboe. The enterprise value of the combined company is projected to exceed $10 billion.
News
June 11, 2024
The addition will mean Vista has two fracking crews and related equipment in operation. The company is aiming to raise production 55% to the equivalent of 85,000 bpd by the fourth quarter, and start production on 138 new oil wells by 2026 in an effort to reach 100,000 bpd.
News
June 09, 2024
Drilling in the U.S. shale patch dropped to the lowest level in almost two-and-a-half years as operators vow to make good on promises to investors for subdued production growth this year.
News
June 07, 2024
Average hourly earnings for front-line oil and gas workers rose 0.5% from March to $44.67, according to a Labor Department report released Friday. Compared with a year ago, oil pay is up 3.2%. The strength in wages matched a national trend, pushing back bets for Federal Reserve rate cuts.
News
June 06, 2024
Drilling operations have been completed safely and successfully, with the well drilled to a total depth of 10,290 feet (measured depth). Zephyr’s operations team is now preparing to set a production liner across the Cane Creek reservoir section, after which the Helmerich & Payne Rig 257 will rig down and demobilise from the site.