Petrogas updates on the drilling of Zircon 1 exploration well in Salawati Kepala Burung

September 29, 2013

Petrogas updates on the drilling of Zircon 1 exploration well in Salawati Kepala Burung

SINGAPORE -- RH Petrogas Limited has posted an update on the drilling of the Zircon-1 exploration well in the Salawati Kepala Burung PSC, Indonesia.

Zircon 1 reached its total vertical depth of 1,525 m and logging operation has since commenced. The well encountered oil shows during drilling in the Kais formation and was deepened from the original planned total vertical depth of 1,205 m to assess the deeper potential.

Production testing will follow if log analysis confirms the presence of hydrocarbon zones.

After completion of Zircon 1, the rig will move to drill the Koi 2 appraisal well as announced on 5 September 2013.

The Company through its wholly owned subsidiaries Petrogas Ltd. and RHP Salawati Island has an aggregate 33.21% working interest in the Island PSC. The other partners in the Island PSC are PetroChina International Kepala Burung Ltd. 16.79% and PT Pertamina Hulu Energi Salawati 50%. The Island PSC is operated by JOB Pertamina PetroChina Salawati, which is a joint operating body formed between Pertamina and PetroChina. The consortium, as contractor of the Indonesian government, operates under the supervision of SKK Migas.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.