Tenaris secures 24,500-ton pipe order for North Africa gas project, boosting European supply

September 12, 2024

(WO) — Tecnimont (MAIRE Group) has entrusted Tenaris with the supply of more than 24,500 tons of seamless pipes for a major gas project located in North Africa, designed to bolster energy security in Europe.

Pipes will be delivered along with Tenaris’s One Line services, a project management package which integrates the supply of pipe with additional services optimizing efficiencies across the supply chain. The project includes a three-layer polyethylene (3LPE) coating applied to the entire order at the Tenaris’s coating facilities in Italy. First deliveries are scheduled for 2025.

“This project holds strategic relevance in ensuring a reliable and uninterrupted supply of natural gas to Italy and, subsequently, to Europe, as a whole,” Giovanni Sola, vice president of group procurement at MAIRE Group, said. “For such an important project, which recognizes the Italian value chain, we’ve selected the solid capabilities of a leading manufacturer such as Tenaris, that can guarantee high-quality products and services and fast-track supply from its Italian operational sites.”

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.