Echo Energy announces gas to surface at Fracción D asset, onshore Argentina

April 13, 2018

LONDON -- Echo Energy plc, the Latin American focused upstream oil and gas company, has announced gas to surface on the first well of a three-well workover campaign at the Company's Fracción D asset, onshore Argentina.

Well CSo-85 was perforated across the Springhill formation and successfully flowed gas to surface without intervention, following which the well flowed through the rig de-gassing system at an estimated rate of 2 MMscfd through a 20/64-in. choke with a tubing head pressure of 1,100 psi.

The full testing unit is expected on site in 10-14 days at which stage a multi-rate, extended flow and build-up test will be undertaken. The Quintana-01 rig will shortly be moving to well CSo-80 to commence workover operations this weekend.

The Company will provide market updates, as appropriate, as the workover program advances.

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.