May 2000
Supplement

00-05_ptd_alternative-fox_T1.htm (May-2000)

A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.

 

  Table 1. Composite results of alternative artificial lift system  
  Well Time system has been installed, months Production
bopd/bwpd
Reduction in power cost, $/month Reduction in operating cost, $/month General comments  
  Before After  
  Keefer 8
Bartlesville
& Peru sands
9 0/80 6.0/3.0 65 700 Unprofitable “water” well converted to profitable producer  
  Ogelsby 1
Peru sand
9 0.5/3.0 2.7/trace 60 0 Essentially eliminated water hauling costs and increased oil production  
  Comstock 1
(Tyler A) Wayside sand
4 3.5/trace 3.5/trace 60 1,000 Unit has operated trouble-free with no well service costs  
  Commonwealth lease
4 Mar-70 7/trace 40 500 Essentially eliminated water production, converting two unprofitable wells to profitable producers  
  Two Bartlesville completions 4 trace/70 4/trace 40 500  
  Combined results   7 bopd 23.2 bopd 265 2,700 Five profitable wells  
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.