June 1998
Industry At A Glance

well-control-pt1-vigeant_fig7.html (Jun-1998)

A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.

 

Figure 7

Fig. 7. When the riser recoil system detects a disconnection, the orifice valves are engaged, which forces tensioner fluids to pass through a restricted opening, thus slowing the recoil to a manageable level.

Back


Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company

Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.