June 1998
Industry At A Glance
well-control-pt1-vigeant_fig7.html (Jun-1998)
A monthly magazine offering industry news, statistics and technical editorial to the oil and gas drilling, exploration and production industry.
Fig. 7. When the riser recoil system detects a disconnection, the orifice valves are engaged, which forces tensioner fluids to pass through a restricted opening, thus slowing the recoil to a manageable level. |
|
Copyright © 1999 World Oil
Copyright © 1999 Gulf Publishing Company