April 2001
Features

Natural Gas: HP/HT Drilling and Completion

Completing large-bore HP/HT wells: Design and experiences: How TotalFinaElf used a completion design that provided an optimized approach for developing Elgin and Franklin fields in the UK North Sea


April 2001 Vol. 222 No. 4 
Feature Article 

NATURAL GAS: Igniting New Markets
Part 3: HP/HT Drilling and Completions

Completing large-bore HP/HT wells: Design and experience to date

The operator developed an optimized completion design for high pressure / high temperature wells with large bore tubulars. The perforating program maximized reservoir productivity while providing operational safety

Alan T. Humphreys, TotalFinaElf Exploration UK PLC

 

This article was adapted from a professional society paper for which World Oil was granted the right to print one time only. Therefore, to review the article, you should refer to the actual World Oil magazine in which it originally appeared.

 
line
Go    Part 1: Exploration Methods
Go    Part 2: North America Outlook
Go    Part 4: Tight Formation Stimulation
   Part 5: Sour Gas Handling
Go    Part 6: Anomalously pressured zones
Go    Part 7: Gathering and Compression
Go    Part 8: Monetizing Stranded Gas
FROM THE ARCHIVE
Connect with World Oil
Connect with World Oil, the upstream industry's most trusted source of forecast data, industry trends, and insights into operational and technological advances.