Mubadala Petroleum reaches FID for Pegaga gas field, offshore Malaysia
ABU DHABI -- Mubadala Petroleum and its partners PETRONAS Carigali Sdn Bhd (PETRONAS Carigali) and Sarawak Shell Berhad have reached the Final Investment Decision for the Pegaga gas field development in Block SK 320, offshore Malaysia. The project will now proceed to the construction and installation stage.
Mubadala Petroleum is Operator of Block SK 320 with 55% interest, PETRONAS Carigali holds 25%, and Sarawak Shell Berhad 20% interest respectively. Mubadala Petroleum and its partners are expected to invest in excess of $1 billion into the development with first gas expected by third-quarter 2021.
Dr. Bakheet Al Katheeri, CEO of Mubadala Petroleum, commented: “The Pegaga gas project is Mubadala Petroleum’s first development in Malaysia and represents an important milestone for us to have brought Pegaga from discovery to the point of sanction with the support from PETRONAS and our partners. Our efforts will now be directed to working closely with our partners and contractors to deliver Pegaga into production on budget and time but most importantly safely.”
Mubadala Petroleum has been present in Malaysia since 2010. Pegaga gas field is located in the Central Luconia province, offshore Sarawak at about 108-m water depth.
The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an eight-legged jacket. The facility is designed for gas throughput of 550 MMscfd, plus condensate. The produced fluids will be evacuated through a new 38-in. subsea pipeline tying in to an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.
Subsequently, Mubadala Petroleum has issued the letter of award for the Engineering, Procurement, Construction, Installation & Commissioning (EPCIC) contract for the Pegaga gas development to Sapura Fabrication Sdn Bhd, a wholly owned subsidiary of Sapura Energy Berhad.